FLOORING & TILING

FLOORING & TILING
Flooring and Tiling stage is made up of various sub-stages like:
- Flooring in rooms, bathrooms & toilets
- Wall tiles in bathrooms, toilets & kitchen
This activity can be carried out at any time of the year.
Time required to complete Flooring and Tiling:
Approx. 27 days for a 750 sq. ft. home and approx. 36 days for a 1000 sq. ft. home
- Procuring, storing and sieving of sand which will be used as flooring bed
Nuvoco has an excellent product that can be used for Tiling Application.
Zero M Speedex Tile Adhesive
A high performance, non-shrink, tile fixing product with high bond strength. Works on both floor and walls tiles thereby saving labour and material cost.
Flooring and Tiling stage is made up of various sub-stages like:
- Flooring in rooms, bathrooms & toilets
- Wall tiles in bathrooms, toilets & kitchen
This activity can be carried out at any time of the year.
Time required to complete Flooring and Tiling:
Approx. 27 days for a 750 sq. ft. home and approx. 36 days for a 1000 sq. ft. home
- Procuring, storing and sieving of sand which will be used as flooring bed
Nuvoco has an excellent product that can be used for Tiling Application.
Zero M Speedex Tile Adhesive
A high performance, non-shrink, tile fixing product with high bond strength. Works on both floor and walls tiles thereby saving labour and material cost.